- Sale
Nuie
Nuie Toilet Seat Cover Caps – Matt White (TSC101)
Sale price £4.32 Regular price £9.00Unit price - Sale
Nuie
Nuie 795 x 500mm Fireclay Double Bowl Butler Sink With Full Weir And Overflow – White (BU121AF32D)
Sale price £213.60 Regular price £445.00Unit price - Sale
Nuie
Nuie Low Level Flush Pipe Pack – Chrome (FA302)
Sale price £66.72 Regular price £139.00Unit price - Sale
Nuie
Sale price £213.60 Regular price £445.00Unit price - Sale
Nuie
Old London / High Level Flush Pipe Pack – Chrome (FA413)
Sale price £277.92 Regular price £579.00Unit price - Sale
Nuie
Nuie Lucie Side Panel – 800mm, 900mm & 1000mm (All Sizes)
Sale priceFrom £160.80 Regular price £335.00Unit price - Sale
Nuie
Nuie Sarani Two Handle Sink Mixer Kitchen Tap – Brushed Gold (KSN1605DL)
Sale price £85.44 Regular price £178.00Unit price - Sale
Nuie
Nuie Jorim Single Lever Kitchen Tap Kitchen Mixer – Chrome (KJR305SL)
Sale price £28.32 Regular price £59.00Unit price - Sale
Nuie
Sale price £367.20 Regular price £765.00Unit price - Sale
Nuie
560mm Old London Richmond 2 Tap Hole Ceramic Basin – White (NCS884)
Sale price £74.40 Regular price £155.00Unit price - Sale
Nuie
Nuie Traditional Cistern Cut-Off Valve – Chrome (FA315)
Sale price £46.56 Regular price £97.00Unit price - Sale
Nuie
Nuie Basket Strainer Sink Waste – Polished Stainless Steel (WE315)
Sale price £31.68 Regular price £66.00Unit price - Sale
Nuie
Nuie 200mm Semi-Frameless Minimal Fixed Wetroom Return Screen – Chrome (NWS1925)
Sale price £51.84 Regular price £108.00Unit price - Sale
Nuie
Nuie Wall Hung Vanity Decorative Legset – Chrome or Brushed Brass (NFL326 / NFL826)
Sale priceFrom £38.88 Regular price £81.00Unit price - Sale
Nuie
Nuie Bridge 2 Tap Hole Mixer Kitchen Tap Lever Handles – Chrome (KB317)
Sale price £94.56 Regular price £197.00Unit price - Sale
Nuie
Nuie Oval Basin Overflow Cover – Brushed Bronze (OVFL15U)
Sale price £12.00 Regular price £25.00Unit price - Sale
Nuie
Hudson Reed Ornate Cistern Brackets – Brushed Brass (FA822)
Sale price £98.40 Regular price £205.00Unit price - Sale
Nuie
Nuie Sarani Two Handle Sink Mixer Tap (All Finishes)
Sale priceFrom £63.36 Regular price £132.00Unit price - Sale
Nuie
Nuie Melbourne 1 Tap Hole Wall Hung Ceramic Basin – 350mm & 450mm (All Sizes)
Sale priceFrom £40.32 Regular price £84.00Unit price - Sale
Nuie
Nuie 320mm Semi-Frameless Concealed Hinged Wetroom Screen With Support Bar – Chrome (NWS1930HC)
Sale price £108.00 Regular price £225.00Unit price - Sale
Nuie
Sale price £226.08 Regular price £471.00Unit price - Sale
Nuie
Sale priceFrom £224.64 Regular price £468.00Unit price - Sale
Nuie
Nuie Isla Rimless Wall Hung Pan – White (NCK240)
Sale price £120.96 Regular price £252.00Unit price - Sale
Nuie
Nuie Yareth Cross Handle Sink Mixer Tap – Chrome (KYA305DL)
Sale price £60.96 Regular price £127.00Unit price - Sale
Nuie
Hudson Reed Low Level Flush Pipe Pack – Brushed Brass (FA802)
Sale price £79.68 Regular price £166.00Unit price - Sale
Nuie
Nuie Toilet Seat Cover Caps – Matt Black (TSC401)
Sale price £4.32 Regular price £9.00Unit price - Sale
Nuie
Nuie 128mm D Handle – 152mm High – Satin Nickel (H005)
Sale price £8.16 Regular price £17.00Unit price - Sale
Nuie
Nuie Square Shower Bath With Legs – 1500mm, 1600mm & 1700mm (All Sizes)
Sale price £263.52 Regular price £549.00Unit price - Sale
Nuie
Nuie 795 x 460mm Fireclay Double Bowl Butler Sink With Ledge – White (BU181AF32D)
Sale price £300.48 Regular price £626.00Unit price - Sale
Nuie
Sale priceFrom £105.60 Regular price £220.00Unit price
Nuie make well-priced, contemporary bathroom products for every room in the house, from cloakroom vanity units to complete family bathrooms. At Key West Bathrooms you can buy the full Nuie range for up to 52% less than RRP.
The Nuie range includes:
- Bathroom furniture – floor-standing and wall-hung vanity units, counter top basin units, full depth furniture packs, toilet units, tall units and mirror cabinets across ranges including Arno, Classique, Deco, Havana and Athena, in finishes from gloss white to satin green, midnight blue and natural oak effects.
- Showering – shower enclosures, doors, wetroom screens and shower trays in rectangular, square, quadrant and offset quadrant shapes.
- Taps and showers – basin taps, bath fillers, bath shower mixers, thermostatic shower valves, shower kits and fixed heads.
- Baths, toilets, basins, heating and kitchens – shower baths, bath panels, ceramics, towel rails, radiators, kitchen sinks and kitchen taps.
Delivery: Nuie products are delivered to UK mainland addresses, usually within 2 working days.
Can't find what you're looking for?
- 📞 Call us – 0333 772 4162
- 📱 WhatsApp – 07757 101 026
- 📧 Email – info@keywestbathrooms.co.uk