Bathroom Renovation Timeline: What to Expect Day by Day

AKW Alveo PVC Bathroom Wall Panels 10mm – Choice of Size, Colour & Fixing Kit

Key West Bathrooms |

Quick answer: Plan for around 5–10 working days for a standard bathroom with one team doing the whole job. Small rooms can be quicker; big layout changes and wet rooms take longer.

A typical week-and-a-bit

When What's happening
Day 1 Water off, old suite and tiles stripped out
Day 2 New pipes, wastes and cables run (first fix)
Days 3–4 Walls boarded or plastered, shower area waterproofed
Days 4–7 Tiling and grouting, or wall panels fitted
Days 7–8 Toilet, basin, bath or shower, taps and towel rail connected (second fix)
Day 9 Silicone, accessories, painting and a final check

Every job is different, but this is the order most fitters follow.

Why some jobs take longer

Several trades. If the plumber, electrician and tiler are booked separately, you will get empty days between visits.

Drying time. Plaster, tanking and grout all need to set before the next stage. Good fitters build this into the plan.

What's under the floor. Rotten boards or old pipework only appear once the room is stripped.

Missing parts. One missing waste or valve can stop work for a day.

How to keep it on track

  • Get every product delivered before day one and open each box to check it.
  • Agree a written plan with your fitter, including when the toilet will be working again.
  • Consider wall panels — no grout means no waiting for it to cure.
  • Keep changes to the plan to a minimum once work starts.

Key takeaways

  • Most standard refits take 5–10 working days.
  • Separate trades mean more calendar days.
  • Have everything on site before work starts.

Common questions

How long does it take to replace a bathroom suite?

Swapping just the suite with no tiling or layout change can often be done in two to three days.

Can I use my bathroom during the work?

Not for most of it. Ask your fitter to reconnect the toilet at the end of each day if it is your only one.