Products versus labour
It surprises a lot of people, but the bath, toilet and basin are rarely the expensive part. A full matching suite can be bought for a few hundred pounds. The money goes on the people who take the old room out and put the new one in: plumbers, tilers, electricians and plasterers.
As a rule of thumb, expect labour and building materials to take the larger share of the total, with the products you choose making up the rest.
Typical prices for each part of the job
| Job | Typical UK price |
|---|---|
| Taking out the old bathroom | £600 – £1,000 |
| First and second fix plumbing | £1,500 – £3,000 |
| Tiling the walls | £950 – £1,250 |
| Electrics (lighting, extractor, towel rail) | About £900 |
| Plastering | About £1,500 |
| Vinyl floor | £250 – £950 |
| Painting and finishing | About £700 |
Figures are typical supply-and-fit ranges for 2026. Expect prices towards the top in London and the South East.
Four decisions that change the total
Staying with the same layout
Leave the toilet, basin and bath or shower where they are and you avoid new pipe runs and floor work — usually the biggest saving available.
Tiles or panels
Floor-to-ceiling tiling takes days. Waterproof wall panels go up in a fraction of the time and need no grout.
Bath, shower or both
Swapping a bath for a walk-in shower is popular, but adds a new tray, screen and sometimes a new valve. Keeping a good bath where it is costs least.
Level-access showering
Wet rooms and flush-floor showers need floor formers and full waterproofing, which adds time and cost — but gives a step-free room that lasts.
Setting your budget
Start with your product list, then get labour quotes from at least three local fitters using that same list. Ask each for the number of working days, and set aside a contingency of 10–15% for anything found behind the old tiles.
Key takeaways
- A standard bathroom typically costs £5,500 – £8,000 fitted.
- Labour, not products, is usually the biggest cost.
- Keeping the layout is the single biggest saving.
- Always keep a 10–15% contingency.
Shop the products
Kartell K-VIT Arc 600mm Wall Mounted 2 Drawer Unit with Ceramic Basin (ARC600WM)
£445.50
Kartell K-VIT Options 550 Rimless Short Projection Close Coupled Toilet – White Gloss (POT078OPR)
From £97.35
AKW Alveo PVC Bathroom Wall Panels 10mm – Choice of Size, Colour & Fixing Kit
From £107.95
Kartell K-VIT Atlantis 600mm Waterproof Floor Standing 2 Door Vanity Unit and Ceramic Basin – White Gloss (ATL600VU)
£237.05
Common questions
What is the average cost of a new bathroom in the UK?
Around £7,000 is a common middle figure for a standard bathroom in 2026, including products and fitting.
What is the most expensive part of a bathroom refit?
Usually the labour — particularly plumbing, tiling and any change to the layout.