Nuie 700mm L-Shaped Acrylic Shower Bath End Panel – European White (WBS301)
Nuie 700mm L-Shaped Acrylic Shower Bath End Panel – European White (WBS301) - European White is backordered and will ship as soon as it is back in stock.
Delivery and Shipping
Delivery and Shipping
Usually Delivered 1-2 Working Days
Description
Description
Nuie 700mm L-Shaped Acrylic Shower Bath End Panel – European White (WBS301)
The Nuie L-Shaped Acrylic Shower Bath End Panel is a bath panel to finish the side or end of your bath. Finish: European White.
Bath panels finish the open side or end of your bath and hide the bath's legs and pipework. Front (side) panels are matched to the bath's length and end panels to its width; most can be trimmed for height on site.
Product Codes
| Colour | Code |
|---|---|
| European White | WBS301 |
Key Features
- Acrylic construction
- 5 year guarantee from Nuie
Before You Buy
- Measure your bath carefully – panels are sized to suit standard bath lengths and widths and can be trimmed for height.
- Check whether a plinth is included or needed.
Looking After It
Clean with warm soapy water or a mild, non-abrasive bathroom cleaner and a soft cloth. Avoid abrasive pads and solvent-based cleaners.
Specifications
- Material: Acrylic
- Guarantee: 5 years
Codes, Sizes, Barcodes and Data Sheets
| Colour | Code | Dimensions | Barcode (EAN) | Data sheet |
|---|---|---|---|---|
| European White | WBS301 | H 500 x W 700 x D 26mm | 5055369083602 |
Delivery
Delivered to UK mainland addresses, usually within 2 working days.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.



