📞0333 772 4162
📩info@keywestbathrooms.co.uk

Order before 2pm for same-day dispatch on most in-stock items (Mon–Fri)

🔧 Are You a Bathroom Installer or Wet Room Specialist?

Join the Key West Bathrooms Trade Programme and unlock 5% trade discounts on our full range — including AKW, Kartell K-VIT, Pressalit Care and more.

Sign Up for a Trade Account →
Nuie  |  SKU: WBS1585L
Sale

Nuie Square Shower Bath With Legs – 1500mm, 1600mm & 1700mm (All Sizes)

Sale price £263.52 Regular price £549.00
Tax included Shipping calculated at checkout.

Size
Handing

Delivery and Shipping

Usually Delivered 1-2 Working Days

Description

Nuie Square Shower Bath With Legs – 1500mm, 1600mm & 1700mm (All Sizes)

The Nuie Square Shower Bath With Legs is a bath. Choose from 3 sizes and left or right hand using the options above. Finish: White.

Check the length, width and shape suit your room and how you'll use the bath – single ended baths have the taps and waste at one end, double ended baths have a central tap position so you can lie back at either end, and shower baths have a wider showering area. Bath panels, taps and wastes are sold separately unless stated.

Product Codes

Choose your options above and the code for that option shows under the product title.

Size Handing Code
1500mm Left Hand WBS1585L
1500mm Right Hand WBS1585R
1600mm Left Hand WBS1685L
1600mm Right Hand WBS1685R
1700mm Left Hand WBS1785L
1700mm Right Hand WBS1785R

Key Features

  • Legs included
  • Acrylic construction
  • 5 year guarantee from Nuie

Before You Buy

  • Measure the space carefully, including the height for the taps and the position of the waste.
  • Support the bath on its legs and a solid base, and check it is level before fitting panels or tiling.
  • Fill the bath with water before sealing around the edges so the sealant cures with the bath at its working weight.

Looking After It

Clean with warm soapy water or a mild, non-abrasive bathroom cleaner and a soft cloth. Avoid abrasive pads and solvent-based cleaners.

Specifications

  • Material: Acrylic
  • Tap holes: 0
  • Waste included: No
  • Bath volume (litres): 200 / 235
  • Capacity (litres): 130 / 165
  • Bath panel included: No
  • Legs included: Yes
  • Guarantee: 5 years

Codes, Sizes, Barcodes and Data Sheets

Size Handing Code Dimensions Barcode (EAN) Data sheet
1500mm Left Hand WBS1585L H 400 x W 855 x L 1498mm 5056211822271 PDF
1500mm Right Hand WBS1585R H 400 x W 855 x L 1498mm 5056211822288 PDF
1600mm Left Hand WBS1685L H 400 x W 855 x L 1598mm 5056211822295 PDF
1600mm Right Hand WBS1685R H 400 x W 855 x L 1598mm 5056211822301 PDF
1700mm Left Hand WBS1785L H 400 x W 855 x L 1695mm 5056211822318 PDF
1700mm Right Hand WBS1785R H 400 x W 855 x L 1695mm 5056211822325 PDF

Delivery

Delivered to UK mainland addresses, usually within 2 working days.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Klarna
  • Maestro
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.